This project included the construction of a 49,000 SF storage building, a 20,000 SF processing building, and a 7,000 SF control building for TBC–Brinadd.  The hardened control building was built with all CMU backup walls and brick facade.  It included offices, conference room, processing area, control room, men’s and women’s locker rooms, and a break room.  Related site improvements include 150,000 SF of paving, a 100,000 SF detention pond, truck well, and loading docks.  The scope of the project also included a 250-ton storage silo with all associated conveying equipment hoppers, bucket elevators, screw conveyors, slide gates, controls, and load out equipment.