CIG RLI Frac Sand Transloading Terminal

, ,
CIG RLI Frac Sand Transloading Terminal

Christensen Building Group designed and constructed this new transloading terminal to include 12,000 tons of storage capacity with 900 tons per hour of off-loading capability. The project included a recessed 15’ deep pit with cast-in-place concrete walls and floor containing a conveyer system to horizontally transport sand offloaded from rail cars to bucket elevators.  The project also included an integral scale system and control building to weigh the trucks before and after loading.

Skills

Posted on

March 24, 2017