FMC Subsea Tree Retractable Structure Work Stations

,
FMC Subsea Tree Retractable Structure Work Stations

This unique design-build project included (2) 3,000 SF retractable structures designed to function as operable work cells in conjunction with 100 ton capacity overhead gantry cranes.  The project included over 420 lf of rail supporting the structures so they could be moved as needed.  All associated infrastructure to support the work stations, including electrical service, LED lighting, water, and pneumatic reels and lines were included.  The tent rails were recessed into large spread footing foundations that were retro fit into the existing paving.

Skills

Posted on

March 22, 2017