CIG Jal Frac Sand Transloading Terminal

CIG Jal Frac Sand Transloading Terminal

This design/build project was designed as a unit train transloading facility for frac sand storage. The project included four (4), 3,000 ton capacity industrial storage tanks with complete conveying systems to unload rail cars at 900 tons per hour and load silos at...
CIG RLI Frac Sand Transloading Terminal

CIG RLI Frac Sand Transloading Terminal

Christensen Building Group designed and constructed this new transloading terminal to include 12,000 tons of storage capacity with 900 tons per hour of off-loading capability. The project included a recessed 15’ deep pit with cast-in-place concrete walls and floor...
FMC Subsea Tree Retractable Structure Work Stations

FMC Subsea Tree Retractable Structure Work Stations

This unique design-build project included (2) 3,000 SF retractable structures designed to function as operable work cells in conjunction with 100 ton capacity overhead gantry cranes.  The project included over 420 lf of rail supporting the structures so they could be...