Project Details

Owner
ExxonMobil
Location
Houston, TX
Construction Delivery
Design-Build
Construction Budget
$3,719,000
Completion Date
January
2021
Size
2400 SF
ExxonMobil North Houston Terminal
New construction of a blast-resistant, 5,000-square-foot terminal control building at an active fuel pipeline terminal facility. The facility included a control center, training area, break room, locker room, and private offices. Work at the active terminal site required close coordination with daily operations and existing pipeline easements at the site.

Key Features

  • Fuel Pipeline Terminal Control Center
  • Construction at an active facility
  • Blast-Resistent Pre-Engineered Metal Building Construction