New construction of a blast-resistant, 5,000-square-foot terminal control building at an active fuel pipeline terminal facility. The facility included a control center, training area, break room, locker room, and private offices. Work at the active terminal site required close coordination with daily operations and existing pipeline easements at the site.
Key Features
Fuel Pipeline Terminal Control Center
Construction at an active facility
Blast-Resistent Pre-Engineered Metal Building Construction