Replacement of major HVAC mechanical equipment located above main meeting hall and worship area. Access to equipment required the removal of existing plaster ceilings and an upgrade to the systems chilled water and boiler systems. The project was done during the summer when operations were minimal and had no impact on any schedule activities and meetings.