Project Details

Owner
City of Pearland
Location
Pearland, TX
Construction Delivery
Design-Bid-Build
Construction Budget
$3,719,000
Completion Date
July
2021
Size
Two-Story, 2,500 SF SF
City of Pearland Fire Training Burn Building
New construction of a cast-in-place concrete fire training burn building. The two-story, 2,500-square-foot, structure featured nine different rooms, balcony, stairs, and roof training spaces. The structure was protected by a special thermal lining system, which maintains the structural integrity of the building. The project was built at an existing fire training campus, with no disruptions to ongoing operations.

Key Features

  • Class-A Live Fire Training in 12 Rooms
  • Roof Rappelling Training & Balcony Platforms
  • Constructed on active campus with no disruptions

Subcontractor Information Form

If you are a subcontractor, we’d love to discuss collaborating. Please fill out the form below and we will reach out to you.

Visit Building Connected for a list of current bidding opportunities.