Project Details

Owner
Petrochemical Company
Location
Wink, TX
Construction Delivery
Construction Manager-at-Risk
Construction Budget
$7500000
Completion Date
November
2023
Size
4500 SF
Wink Field Tech Office
Ground-up construction of a 4,500 square foot office building and a 1,200 square foot shop facility. The project included the installation of pre-engineered metal buildings with full interior build-out, extensive site utilities such as septic and water systems, fire and fiber optic lines, and comprehensive paving solutions featuring concrete and crushed concrete surfaces.

Key Features

  • Pre-engineered metal buildings
  • Complete interior build-out
  • Extensive utility infrastructure 
  • Comprehensive site paving

Subcontractor Information Form

If you are a subcontractor, we’d love to discuss collaborating. Please fill out the form below and we will reach out to you.

Visit Building Connected for a list of current bidding opportunities.