Ethox Pasadena Campus
Project Details Completion Date Key Features Four pre-engineered metal buildings 130,000 SF of paving Self-contained fire pump building 2.36-acre storm detention pond Back to all
Project Details Completion Date Key Features Four pre-engineered metal buildings 130,000 SF of paving Self-contained fire pump building 2.36-acre storm detention pond Back to all
Project Details Completion Date Back to all projects Related Projects
Project Details Completion Date thinking design, creative solutions Key Features Chemical Processing Facility 250-Ton Material Storage Silo Operational Chemical Manufacturing Complex Back to all
Project Details Completion Date Key Features 4 Silos with 3,000 Tons Total Capacity Conveying Systems Capable of 900 Tons per Hour Control System Design &
Project Details Completion Date thinking design, creative solutions Key Features Fabrication Warehouse with Overhead Crane Class-A Executive Office Space Tilt-Wall and Pre-Engineered Metal Building Systems
If you are a subcontractor, we’d love to discuss collaborating. Please fill out the form below and we will reach out to you.
Visit Building Connected for a list of current bidding opportunities.